Ko_sha_024.jpg-c700_250

Description:

Sustainable site
Heat Island Effect—Non-roof
Place more than 50% of parking spaces underground.

Development Density and Community Connectivity
A Building that is located within 1/2 mile of residential area and has at least 10 basic services.

Alternative Transportation—Public Transportation Access
Railway station in a radius of 800 miles, and there are 3 railways.

Water Efficiency
Using Kohler water conservation sanitary appliance.

Energy & Atmosphere
Fundamental Commissioning of Building Energy Systems
Designate a Commissioning Authority(C×A) to verify the building’s energy related system.

Minimum Energy Performance
Reduce connected lighting power density 10% below that allowed by ASHAREA 90.1-2007

Fundamental Refrigerant Management
Zero use of CFC-based refrigerants.

Optimize Energy Performance - Lighting Power
Reduce the connected lighting power density. Total lighting power density reduction meets or exceeds 20%.

Optimize Energy Performance - Equipments and Appliances
Purchasing Energy Star qualified equipment which is more than 77%.

Enhanced Commissioning
Designate a Commissioning Authority (C×A) to verify the building’s energy related system.

Measurement and Verification
Install sub metering equipment to measure and record energy use within the tenant space.
Negotiate a lease whereby energy costs are paid by the tenant and not included in the base rent.

Green Power
Purchase green power RECs to support green power development.

Material and Resource
Storage and Collection of Recyclables
Provide an easily accessible dedicated area for the collection of materials for recycling for the tenant space. Materials must include paper, corrugated cardboard, glass, plastics, and metals.

Construction Waste Management
Recycle or sale at least 50% to 75% of construction waste.

Recycled Content
Use materials, including furniture and furnishings, with recycled content such that the sum of post-consumer plus 1/2 of pre-consumer content constitutes at least 10% or 20% based on cost of the total value.

Regional Materials
Choosing the construction materials within a radius of 800 miles to reduce the carbon dioxide emissions

Indoor Environmental Quality
Minimum Indoor Air Quality Performance
Provide a comfortable environment by fresh air.

Environmental Tobacco Smoke (ETS) Control
Confirm that smoking is prohibited in the office area.

Construction IAQ Management Plan—During Construction
Develop and implement an IAQ management plan for the construction and preoccupancy phases of the tenant space.

Construction IAQ Management Plan—Before Occupancy
Adequate ventilation before move in

Low-Emitting Materials—Adhesives and Sealants
All adhesives and sealants comply with the requirements of SCAQMD and Green Seal Standard.

Low-Emitting Materials—Paints and Coatings
All paints and coating comply with the requirements of SCAQMD and Green Seal Standard.

Low-Emitting Materials—Flooring Systems
Using low-Emitting flooring system with CRI Plus certificate.

Controllability of Systems—Lighting
Provide individual lighting controls (lamps) for 100% of all building occupants. Provide lighting controls for all shared multi-occupant spaces to meet the group needs in the conference room.

Thermal Comfort—Design
Comfortable thermal design meets the requirements.

Thermal Comfort—Verification
Do the verification of thermal comfort 3 months later after move in.

Daylight and Views—Daylight 75%
Take advantages of daylighting adequately.

Daylight and Views—Views
Achieve a direct line of sight to the outdoor environment by using glass VLT.

Innovation and Design Process
Green Education
LEED idea education

LEED AP
2 LEED Accredited Professional for the project as consultants.
More/Hide

Materials:

View All

Project Team:

  • Mini_magick20130422-26114-3hfzmg.jpg-e49
  • Mini_magick20130509-6104-ccpb95.png-e49
  • Mini_magick20130427-27413-14gpn66.jpg-e49
Loading...
×
server error: